Skip to content

chore(deps): update dependency docling-parse to v4.7.3

b7149c7
Select commit
Loading
Failed to load commit list.
Closed

chore(deps): update dependency docling-parse to v4.7.3 #77

chore(deps): update dependency docling-parse to v4.7.3
b7149c7
Select commit
Loading
Failed to load commit list.
Red Hat Konflux kflux-prd-rh02 / Konflux kflux-prd-rh02 / rag-tool-on-pull-request failed Feb 10, 2026 in 1h 0m 2s

Failed

Konflux kflux-prd-rh02/rag-tool-on-pull-request has failed.

Details


Task Statuses:

StatusDurationName
🟢 Succeeded 8 seconds

init

🟢 Succeeded 27 seconds

clone-repository

🟢 Succeeded 5 minutes

prefetch-dependencies

🟢 Succeeded 18 minutes

build-images

🟢 Succeeded 27 minutes

build-images

🟢 Succeeded 16 seconds

build-image-index

🟢 Succeeded 2 minutes

clair-scan

🟢 Succeeded 12 seconds

deprecated-base-image-check

🟢 Succeeded 1 minute

clair-scan

🟢 Succeeded 5 seconds

apply-tags

🟢 Succeeded 16 seconds

push-dockerfile

🟢 Succeeded 20 seconds

coverity-availability-check

🟢 Succeeded 1 minute

rpms-signature-scan

🟢 Succeeded 4 minutes

ecosystem-cert-preflight-checks

🟢 Succeeded 2 minutes

clamav-scan

🟢 Succeeded 6 minutes

ecosystem-cert-preflight-checks

🟢 Succeeded 5 minutes

clamav-scan

🟢 Succeeded 5 minutes

build-source-image

🟢 Succeeded 1 minute

sast-unicode-check

🟢 Succeeded 1 minute

sast-snyk-check

🟢 Succeeded 50 seconds

sast-shell-check

🔴 Failed 0 seconds

sast-coverity-check


Failure snippet:

task sast-coverity-check has the status "TaskRunCancelled":
TaskRun "rag-tool-on-pull-request-9q2j5-sast-coverity-check" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has timed out.