Skip to content

docs(specs): ops-specs-features Phase 0 audit — spec already executed#290

Merged
silversurfer562 merged 1 commit into
mainfrom
ops-specs-features-phase0-close
May 13, 2026
Merged

docs(specs): ops-specs-features Phase 0 audit — spec already executed#290
silversurfer562 merged 1 commit into
mainfrom
ops-specs-features-phase0-close

Conversation

@silversurfer562
Copy link
Copy Markdown
Member

Summary

Phase 0 gate verification done for docs/specs/ops-specs-features/. Both 0.1b (CI status) and 0.5 (scope re-check) satisfied.

Key finding: the spec is far more done than tasks.md showed. Phases 1, 2, and 3 were all shipped via PRs #236, #239, #249 — but only Phase 2/3 checkboxes got flipped at the time. Phase 1's checkboxes sat as [ ] todo while the code lived on main for days.

Verification

Gate Status Evidence
0.1b CI green on main Latest 2 runs (fca8c2d7, 7d988f52) green. One earlier flaky-timeout failure not a new mode.
0.5 Scope still right Originally-decided scope fully implemented; no adjustment needed.
Phase 1.1 (GET endpoints) ✅ shipped specs.py:159,186
Phase 1.2 (--specs-root CLI) ✅ shipped cli.py:45,117
Phase 1.3 (tests at parity) ✅ shipped 54 tests in tests/unit/ops/test_specs_*.py, all green

What's actually left

Phase 4 (reflection cycle) is time-gated, not work-gated:

  • 4.1 After 2 weeks of usage, log most-used features
  • 4.2 Decide whether read-side is enough
  • 4.3 File follow-up spec if usage warrants

Target date for Phase 4 evaluation: 2026-05-25.

What this PR does

  • New phase0-audit.md with the full verification table
  • tasks.md checkboxes 0.1b, 0.5, 1.1, 1.2, 1.3 all flipped to [x] with PR references
  • Spec status flipped from "Approved & Prioritized" → "Phases 1–3 complete; Phase 4 awaiting 2 weeks of usage"

What this PR does NOT do

Per the Tier-1-pure-audit framing: no production code changes. The implementation has been on main for days; this PR brings the spec's tracking docs in line with reality.

Test plan

  • All claims verified against src/attune/ops/routes/specs.py and cli.py directly
  • pytest tests/unit/ops/test_specs_*.py -n auto → 54 passed in 3.63s
  • CI history on main inspected via gh run list
  • No code changes; pre-commit hooks pass

🤖 Generated with Claude Code

Phase 0 gate verification done. Both 0.1b and 0.5 satisfied.

Key finding: the spec is far more done than tasks.md showed.
Phases 1, 2, 3 were all shipped via PRs #236, #239, #249 — but only
Phase 2/3 checkboxes got flipped at the time. Phase 1's checkboxes
sat as [ ] todo while the code lived on main for days.

Verification:
- All Phase 1 capabilities exist (GET /api/specs, GET /api/specs/{slug},
  --specs-root CLI flag, multi-root support).
- 54 tests in tests/unit/ops/test_specs_*.py — all green.
- All "What we explicitly do NOT port" items confirmed absent.
- CI on main: 2 consecutive successful runs, one earlier flaky
  timeout failure (not a new mode).

Spec status flipped to "Phases 1–3 complete; Phase 4 reflection
cycle awaiting 2 weeks of usage (target: 2026-05-25)." Phase 4 is
time-gated by design, not work-gated.

Files:
- phase0-audit.md (new) — verification of both gate conditions plus
  the per-task confirmation that Phase 1 shipped
- tasks.md — 0.1b, 0.5, 1.1, 1.2, 1.3 all flipped to [x] with PR
  references; spec status updated to reflect reality

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@vercel
Copy link
Copy Markdown

vercel Bot commented May 13, 2026

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
attune-ai Error Error May 13, 2026 3:27am
website Ready Ready Preview, Comment May 13, 2026 3:27am

@github-actions github-actions Bot added the documentation Improvements or additions to documentation label May 13, 2026
@silversurfer562 silversurfer562 merged commit 45f94da into main May 13, 2026
31 of 34 checks passed
@silversurfer562 silversurfer562 deleted the ops-specs-features-phase0-close branch May 13, 2026 03:27
@codecov
Copy link
Copy Markdown

codecov Bot commented May 13, 2026

Codecov Report

✅ All modified and coverable lines are covered by tests.

📢 Thoughts on this report? Let us know!

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

documentation Improvements or additions to documentation

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant