Skip to content

Reject client enable-push settings (#1318) #213

Reject client enable-push settings (#1318)

Reject client enable-push settings (#1318) #213

Triggered via push May 23, 2026 17:41
Status Failure
Total duration 26s
Artifacts

ci.yml

on: push
Matrix: tox
Fit to window
Zoom out
Zoom in

Annotations

9 errors
tox (3.12)
Process completed with exit code 2.
tox (3.11)
The strategy configuration was canceled because "tox._3_12" failed
tox (3.11)
The operation was canceled.
tox (3.13)
The strategy configuration was canceled because "tox._3_12" failed
tox (3.13)
The operation was canceled.
tox (3.14)
The strategy configuration was canceled because "tox._3_12" failed
tox (3.14)
The operation was canceled.
tox (3.10)
The strategy configuration was canceled because "tox._3_12" failed
tox (3.10)
The operation was canceled.