You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
4.4.3.2: PERMANENT_DATA_T is not traceable to "OETCS_API Requirements_appendix_functional_data_dictionary_v1.0.pdf"
4.4.4.4: "If it is the case, the train shall never be able to start again until new software is downloaded to restore a correct content to that Novram." It's unclear, which part of the sw is in charge for this function. Additionally, it is platform / hardware dependant since it requires collaboration with the NVRam store function.
4.6.2.1: "The Application shall never use directly the Basic SW clock." What does this mean practically?
4.7.2.4, first diagram: in a section of the diagram, the term (Distance(maximum) - Distance(nominal)) is decreasing. Is this a practical situation?
4.8.2.4: "As long as the train is stopped over the balise, the telegram will not
be provided to the application": Therefore, the application SW does not know about this position until the train leaves its position on the balise. Is this practically tolerable?
be provided to the application": Therefore, the application SW does not know about this position until the train leaves its position on the balise. Is this practically tolerable?