From ee5d7d593ce691712a154fe5d48932842b2142ee Mon Sep 17 00:00:00 2001 From: Keigh Rim Date: Mon, 30 Mar 2026 14:02:13 -0400 Subject: [PATCH] docs pipeline standardization with other SDK repos and minor fixes --- .github/workflows/publish.yml | 4 -- CONTRIBUTING.md | 3 ++ documentation/conf.py | 86 +++++++++++++++++++---------------- 3 files changed, 50 insertions(+), 43 deletions(-) diff --git a/.github/workflows/publish.yml b/.github/workflows/publish.yml index 12dd2ab8..567129d7 100644 --- a/.github/workflows/publish.yml +++ b/.github/workflows/publish.yml @@ -49,8 +49,4 @@ jobs: source_ref: ${{ needs.check-pypi.outputs.version }} project_name: mmif-python version: ${{ needs.check-pypi.outputs.version }} - build_command: 'python3 build-tools/docs.py --build-ver ${{ needs.check-pypi.outputs.version }} --output-dir docs' - docs_output_dir: 'docs/${{ needs.check-pypi.outputs.version }}' - python_version: '3.11' - update_latest: true secrets: inherit diff --git a/CONTRIBUTING.md b/CONTRIBUTING.md index e544de48..d9d7fa7c 100644 --- a/CONTRIBUTING.md +++ b/CONTRIBUTING.md @@ -121,6 +121,9 @@ python3 build-tools/docs.py --build-ver v1.0.0 This runs the build in a sandboxed temporary directory. The output will be in `docs-test/`. +> [!NOTE] +> In CI, documentation is built and published automatically by the `publish.yml` workflow via the shared `sdk-docs.yml`. The CI calls `docs.py --build-ver --output-dir _docs`. All CLAMS SDK repos use the same `docs.py` CLI interface (`--build-ver`, `--output-dir`). + ### Troubleshooting Old Version Builds **Important:** The build script (`build-tools/docs.py`) uses a "Modern Environment, Legacy Source" strategy. It checks out the old source code but installs **modern** build dependencies (Sphinx 7.x, Furo) to ensure the build works on current systems (including Python 3.13). diff --git a/documentation/conf.py b/documentation/conf.py index 81b989ba..5c0fe38c 100644 --- a/documentation/conf.py +++ b/documentation/conf.py @@ -4,10 +4,12 @@ import datetime import inspect -import textwrap +import json import os import re +import subprocess import sys +import textwrap from pathlib import Path from sphinx.util import logging @@ -151,6 +153,9 @@ def update_target_versions(app): return current_ver = mmif.__version__ + # Skip dev/dummy versions to avoid dirtying the git-tracked CSV + if 'dev' in current_ver or not re.match(r'^\d+\.\d+\.\d+$', current_ver): + return spec_ver = mmif.__specver__ csv_path = proj_root_dir / 'documentation' / 'target-versions.csv' @@ -197,50 +202,53 @@ def generate_cli_rst(app): def generate_whatsnew_rst(app): """ - Create the documentation/whatsnew.md file by pulling out the changes for the - current version from the changelog file. - """ + Generate whatsnew.md by fetching the latest release PR body + from GitHub via ``gh pr list``. - changelog_path = proj_root_dir / 'CHANGELOG.md' + Falls back gracefully if ``gh`` is unavailable (local builds). + """ output_path = proj_root_dir / 'documentation' / 'whatsnew.md' - if not changelog_path.exists(): - logger.warning(f"CHANGELOG.md not found at {changelog_path}") - with open(output_path, 'w') as f: - f.write("") - return - - content = [] - found_version = False - version_header_re = re.compile(r'^## releasing\s+([^\s]+)\s*(\(.*\))?') - - logger.debug(f"Looking for version '{version}' in CHANGELOG.md") + repo = f'clamsproject/{project}' - with open(changelog_path, 'r') as f: - lines = f.readlines() + try: + result = subprocess.run( + ['gh', 'pr', 'list', + '-s', 'merged', '-B', 'main', + '-L', '100', + '--json', 'title,body', + '--repo', repo], + capture_output=True, text=True, timeout=15, + ) + if result.returncode != 0: + raise RuntimeError(result.stderr) + + prs = json.loads(result.stdout) + pr = next( + (p for p in prs + if p['title'].startswith('releasing ')), + None, + ) + if pr is None: + raise RuntimeError("No release PR found") + title = pr['title'] + body = pr.get('body', '') - for line in lines: - match = version_header_re.match(line) - if match: - header_version = match.group(1) - if header_version == version: - found_version = True - # We don't include the header line itself in the content we want to wrap - continue - elif found_version: - break - - if found_version: - content.append(line) - - if not found_version: - logger.info(f"No changelog entry found for version {version}") with open(output_path, 'w') as f: - f.write(f"### nothing new in {version}\nDid you locally build for testing?") - else: - # Dump matched markdown content directly to whatsnew.md + f.write(f"## {title}\n\n") + f.write(f"(Full changelog: " + f"[CHANGELOG.md]" + f"({blob_base_url}/main/CHANGELOG.md))\n\n") + if body: + f.write(body) + logger.info(f"Generated whatsnew.md from PR: {title}") + + except Exception as e: + logger.warning( + f"Could not fetch release notes via gh: {e}. " + f"Writing empty whatsnew.md" + ) with open(output_path, 'w') as f: - f.write(f"## What's New in {version}\n\n(Full changelog available in the [CHANGELOG.md]({blob_base_url}/main/CHANGELOG.md))\n") - f.writelines(content) + f.write("") def run_apidoc(app):