integration with new basic TimeFrame sampling built-ins in mmif-python #695
codecov.yml
on: pull_request
Matrix: 🤙 Call SDK test workflow / 🧪 Test with coverage
🤙 Call SDK test workflow
/
☁️ Upload coverage to Codecov
0s
Annotations
5 errors
|
🤙 Call SDK test workflow / 🧪 Test with coverage (3.12)
Process completed with exit code 2.
|
|
🤙 Call SDK test workflow / 🧪 Test with coverage (3.11)
The strategy configuration was canceled because "test-and-codecov.test._3_12" failed
|
|
🤙 Call SDK test workflow / 🧪 Test with coverage (3.11)
The operation was canceled.
|
|
🤙 Call SDK test workflow / 🧪 Test with coverage (3.10)
The strategy configuration was canceled because "test-and-codecov.test._3_12" failed
|
|
🤙 Call SDK test workflow / 🧪 Test with coverage (3.10)
The operation was canceled.
|