Skip to content

fix: path of tests in workflow #8

fix: path of tests in workflow

fix: path of tests in workflow #8

Triggered via push January 23, 2026 16:15
Status Failure
Total duration 50s
Artifacts

ci.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (3.8)
Process completed with exit code 1.
tests (3.11)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.11)
Process completed with exit code 1.
tests (3.9)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.9)
The operation was canceled.
tests (3.10)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.10)
The operation was canceled.