Table of contents Some Generic Project 1 Analysis 1.1 Problem Identification 1.2 Stakeholders 1.3 Research 1.4a Features of Proposed Solution 1.4b Computational Methods 1.5 Success Criteria 1.6 Hardware and Software Requirements 2 Design and Development 2.1 Design Frame 2.2 Stage setup 2.3 Movement 2.4 Enemy design 2.5 Boss design 2.7 Power up 2.8 Win/Loss setup 2.9 Menu setup 3 Testing 3.1 Testing for Function and Robustness 3.2 Usability Testing 3.3 Checking Development Tests 4 Evaluation 4.1 Evaluation of Success Criteria 4.2 Evaluation of Usability Features 4.3 Maintenance and Future Development Refrence page