Skip to content

Breaking: Converts to Swift Concurrency #7

Breaking: Converts to Swift Concurrency

Breaking: Converts to Swift Concurrency #7

Triggered via pull request June 27, 2025 00:22
Status Cancelled
Total duration 4h 23m 50s
Artifacts

test.yaml

on: pull_request
Matrix: test / linux
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test / Test on Linux - swift:6.1-noble
Process completed with exit code 1.
test / Test on Linux - swift:5.10-noble
The operation was canceled.
test / Test on Linux - swift:5.10-noble
The strategy configuration was canceled because "test.linux.swift_6_1-noble" failed
test / Test on Linux - swift:6.1-jammy
The strategy configuration was canceled because "test.linux.swift_6_1-noble" failed
test / Test on Linux - swift:6.0-jammy
The operation was canceled.
test / Test on Linux - swift:6.0-jammy
The strategy configuration was canceled because "test.linux.swift_6_1-noble" failed
test
The run was canceled by @NeedleInAJayStack.
test
The run was canceled by @NeedleInAJayStack.
test / Test on macOS
The operation was canceled.
test / Test on macOS
The run was canceled by @NeedleInAJayStack.