Summary
Prioritized execution plan for the post-#88 content options backlog (#89–#95). Three sequential batches using a hybrid parallel/sequential agent strategy. Pre-production context — full test coverage and clean abstractions throughout.
Design doc
docs/plans/2026-04-14-content-options-phase2-backlog.md
Scope
Batch A — 2 parallel agents (start immediately)
Batch B — 1 agent (after Batch A merged)
Batch C — 1 agent (after Batch B merged)
Deferred
Summary
Prioritized execution plan for the post-#88 content options backlog (#89–#95). Three sequential batches using a hybrid parallel/sequential agent strategy. Pre-production context — full test coverage and clean abstractions throughout.
Design doc
docs/plans/2026-04-14-content-options-phase2-backlog.mdScope
Batch A — 2 parallel agents (start immediately)
watch_notifications.htmlonly)Batch B — 1 agent (after Batch A merged)
Batch C — 1 agent (after Batch B merged)
Deferred